Name
construction object

Property location

Start accepting applications

Completion of applications

Data sheet

1

Administrative housing complex ”, spot 2, block 14

Astana city, Almaty district, 23-15, section 11/2

04.11.2016 year.

09.11.2016 year.
(until 5 p.m.)

Download

2

“Residential complex north of Abay Avenue east of Manas Street, Almaly district in the city of Almaty. 1st stage »

Almaty city

22.08.2017year.

25.08.2017year.

Download

3

“Apartment building complex with built-in premises and parking, Astana, the area of intersection of Kordai and Taikazan streets.” (Adjustment).

Astana city

22.12.2017year.

27.12.2017year.

Download

4

“Apartment building complex with built-in premises and parking. Address: Astana, district of intersection of R. Koshkarbayev Ave. and 23-17 street (design name). Adjustment.

Astana city

14.02.2018year.

19.02.2018year.

Download

5

Construction of a residential complex & laquo; Bakhyt & raquo; in the Nursat microdistrict of the city of Shymkent. Blocks 4,6,7 (Adjustment).

Shymkent city

07.03.2018year.

14.03.2018year.

Download

6

"Apartment building complex

"Alma City"

Almaty city, Nauryzbay district, Shugyl microdistrict, st. Saken Zhunisov, plot No. 2/37

04.04.2018year.

12.04.2018year.(повтор)

09.04.2018year.

17.04.2018year.

Download

7

Multi-apartment residential complex with built-in premises and parking

Astana city, Yesil region, south of the Telman housing estate, area with design names E111, E117, E120, E770 1 stage of construction, position No. 1, 2 stage of construction, position 3.

13.04.2018year.

((until 09.30 p.m.))

18.04.2018year.

(until 5 p.m.)

Download

8

Construction of a nine-story 126-apartment residential building

WKO Uralsk st. Gagarin 1.

17.04.2018year.

(09.30 until )

20.04.2018year.

(until 5 p.m.)

Download

9

"Multifunctional residential complex" City Romance "Quarter 8"

Astana city, crossing the streets of T прuelsizdіk avenue (projected), st. Sh. Қaldayakova and st. No. A13, A19, A33, A34 (design name). 1st stage of construction. Spots 4, 5, 6, 7, 15.1 and external engineering networks. ” (15 stage. 1.2 stages, without external engineering networks).

09.10.2018year.

(until 09.30 p.m.)

12.10.2018year.

(until 5 p.m.)

Download

10

"The construction of multi-storey residential buildings (multifunctional residential complex" Elimai ") second stage, at the address Nauryzbay district st. Zhailau, study 2G, 2D, 2B, in the city of Almaty ”(without external engineering networks). The first launch complex: 1; 2; eleven; 12; 13; 14; 15; 16. The second launch complex: 3; 4; five; 6; 7; 8; nine; ten".

Almaty, Nauryzbay district st. Zhailau, study 2G, 2D, 2VВ

(until 14-30 p.m.) 07.12.2018 year.

(until 5 p.m.) 12.12.2018 year.

12.10.2018year.

(until 5 p.m.)

Download

11

"Multifunctional residential complex" Urban Romance "Quarter 8 in Astana, at the intersection of Təuelsіzdіk avenue (planned), st. Sh. Қaldayakova and st. No. A13, A19, A33, A34 (design name). 1st stage of construction. Spots 4, 5, 6, 7, 15.1 and external engineering networks.

Astana city, at the intersection of Təuelsіzdіk avenue (projected), st. Sh. Қaldayakova and st. No. A13, A19, A33, A34 (design name).

03.01.2019year.

09.01.2019 year.(until 5 p.m.)

Download

12

A multi-apartment residential complex with built-in premises and parking lots, in the area of ​​intersection of Hussein bin Talal and No. 38 of Astana city LCD "NOVA CITY" - 19 turn. (Without external engineering networks).

Astana city, left bank, the intersection of Hussein bin Talal and No. 38

06.02.2019 year.

(until 09.30 p.m.)

11.02.2019 year.

(until 5 p.m.)

Download

13

A multi-apartment residential complex with built-in premises and parking, located at: Astana, Yesil district, Turan ave., Site 55, intersection area of ​​E22 st. LCD "Sezim Qala" -1 construction phase "(Without external engineering networks).

Astana city, Yesil district, Turan ave., area 55, intersection area of ​​E22 street пересечения ул.Е22.

06.02.2019 year.

(until 09.30 p.m.)

11.02.2019 year.

(until 5 p.m.)

Download

14

"Construction of multi-apartment residential buildings. PC" Ray of the East ", Besagash, Besagash s / o, Talgar district, Almaty region. (Second launch complex, spots 3-5)" (without external engineering networks) "

The plot of apartment buildings of the PC "Ray of the East" is located in with. Besagash, Besagash s / o, Talgar district, Almaty region, Бесагашского с/о, Талгарского района, Алматинской области

11.07.2019 year.

(until 09.30 p.m.)

16.07.2019 year.

(until 5 p.m.)/p>

Download

15

"A multi-apartment residential complex with built-in premises and a parking lot at the intersection of A. Baitұrsynұly and A56 streets (design name) of the Almaty district of Astana city (without external engineering networks). Correction, 1 stage."

The construction site is located in the city of Nur-Sultan, the southeast outskirts, the Almaty district, the intersection of A. Baitursynuly and A 56 streets (design name)

11.07.2019year.

(until 09.30 p.m.)

16.07.2019year.

(until 5 p.m.)

Download

16

"Construction of 2 5-storey 40 apartment buildings on Maytobe Street No. 214 in the Nurtas microdistrict, Karatau district, Shymkent (without external networks)"

The construction site is located in Shymkent, Karatau district, in the microdistrict. Nurtas, on the street Maytobe No. 214

09.08.2019year.

(until 5 p.m.)

(until 5 p.m.) 14.08.2019year.

Download

17

"Apartment building complex, with built-in premises, parking and office buildings on the land plot No. 4 of E49 street, Esil district of Astana. Spot No. 1,2,3 and external engineering networks"

The plot of the multi-apartment residential complex, with built-in premises, parking and office buildings, is located on the left bank of the Yesil River, at the intersection of Turan Avenue and Kerey-Zhanibek Khandar Street in the city of Nur-Sultan

24.09.2019year.

(until 09.30 p.m.)

(until 5 p.m.) 27.09.2019year.

Download

18

"A multi-apartment residential complex with built-in premises, a parking and a hotel and entertainment complex with commercial premises in Astana, Yesil district, Turan Avenue, plot No. 55/12 between No. E22 and No. 26 (project name). Stage I construction. (Without external engineering networks) "

Nur-Sultan, Yesil district, Turan Avenue, plot No. 55/12 between ul. No. E22 and No. 26 (design name)

02.10.2019year.

(until 09.30 p.m.)

(until 5 p.m.)07.10.2019year.

Download

19

"A multi-apartment residential complex with built-in premises on street No. 23-8 (project name), between R. Koshgarbayev Avenue and A. Baitұrsynұly street of the Almaty district of the city of Astana. Stage 2, block sections 4, 5, 6, 7 (without external engineering networks). Adjustment "

Nur-Sultan, district of Almaty, street No. 23-8 (design name), between R. Koshgarbayev Avenue and A. Baitұrsynyly Street

02.10.2019year.

(until 09.30 p.m.)

(until 5 p.m.)07.10.2019year.

Скачать

20

Multi-apartment residential complex with built-in premises, parking and a hotel and entertainment complex with retail premises

in Astana city, Yesil district, Turan Avenue, plot No. 55/12 between street No. E22 and No. 26 (design name). I stage of construction. (Without external engineering networks)

(until 5 p.m.) 7 октября 2019year.

Download

21

A multi-apartment residential complex with built-in premises, a parking and a hotel and entertainment complex with retail premises in Astana, Yesil District, Turan Avenue, plot No. 55/12 between No. E22 and No. 26 (design name). I stage of construction. (Without external engineering networks))

The construction site is located in the Esil district, along Turan Avenue, plot No. 55/12 between streets No. E22 and No. 26 in the city of Nur-Sultan.

11.10.2019 year.

(until 5 p.m.) 16.10.2019 year.

Download

22

Construction of a multi-apartment residential complex with built-in premises and parking, microdistrict. "Kalkaman-2", Abisheva street, house number 36, Nauryzbaysky district in the city of Almaty. II stage of construction. 1 start-up complex (spots 9, 10, 11), 2 start-up complex (spots 12, 13, 14), External engineering networks "

The construction site is located in Almaty, Nauryzbaysky district, microdistrict. Kalkaman-2, Abisheva street No. 36.

30.10.2019 year.

(until 5 p.m.) 04.11.2019 year.

Download

23

"Multi-apartment residential complexes with built-in premises and parking lots, office buildings with parking lots, office building with parking lots, public houses and a medical center located at the address: Astana, Almaty district, intersection of A. Baitұrsynuly, K. Әzіrbaeva street and No23 -16 (design name) "Spot 3. Block 1 (section 1), Block 1 (section 2), Block 2 (section 1), Block 5 (section 1). (Without external engineering networks)"

The plot of multi-apartment residential complexes is located in the city of Nur-Sultan, Almaty district, at the intersection of A. Baitұrsynuly, K. Әzіrbaev and No23-16 (design name)

11.11.2019 года

(until 5 p.m.) 14.11.2019 year.

Download

24

"Construction of a multifunctional residential complex and a public services building in the Kairat microdistrict, study 157/1, Turksib district in Almaty," Spots 1, 2 ".

The construction site of a multifunctional residential complex is located in microdistrict. Kairat in the Turksib district of Almaty.

15.11.2019 year.

(until 5 p.m.) 20.11.2019 year.

Download

25

"Multi-apartment residential complexes with built-in, built-in attached buildings and parking lots, business centers, shopping and entertainment facilities, kindergartens, comprehensive schools and a park zone located at the address: Astana, Yesil district, intersection of Kerey streets, Zhanibek Khandar, Bukar Zhyrau, No. 37, 38. Quarter 1A "(without external engineering networks)

The site is located in Nur-Sultan, at the intersection of Kerey, Zhanibek Khandar, Bukhar Zhyrau, No. 37 and No. 39 (project names), block 1A.

24.01.2020 year.

(until 5 p.m.)29.01.2020 year.year.

Download

26

"A multi-apartment residential complex with built-in premises and parking, located at the address: Astana, Yesil district, the intersection of streets with design names E51, E68. 1st stage of construction "(without external engineering networks)". (without external engineering networks)

The construction site of the residential complex is located in the city of Nur-Sultan, Esil district, at the intersection of streets with design names E51, E68.

24.01.2020 year.

(until 5 p.m.) 29.01.2020 year.

Download

27

"A multi-apartment residential complex with built-in premises and parking, located at the address: Nur-Sultan city, Almaty region, Ryskulbekov St., Uch. 29." 1 stage of construction (with external engineering networks) "(without external engineering networks).

The site is located in the city of Nur-Sultan, Almaty region, st. Ryskulbekova, school 29.

24.01.2020 year.

(until 5 p.m.) 29.01.2020 year.

Download

28

"A multi-apartment residential complex with built-in premises and parking, located at: Nur-Sultan, Yesil district, Turan avenue, plot No. 52. Stage 1 of construction" (without external engineering networks)

The site is located Nur-Sultan, the district "Yesil", Turan Avenue, plot number 52.

06.02.2020 year.

(until 5 p.m.) 11.02.2020 year.

Download

29

"A residential complex with built-in rooms and a parking lot, a built-in primary school and a center for child development, located at Astana, Dostyk St., plot No. 8; 8/2" in the square of Dostyk, Sauran, Syganak Streets, "1 - construction phase. Spots 1,2,3,4 "(without external engineering networks)".

The site is located Astana, st. Dostyk plot number 8; 8/2 "in the square of Dostyk, Sauran, Syganak streets."

06.02.2020 year.

(until 5 p.m.) 11.02.2020 year.

Download

30

"Construction of a multi-apartment residential complex with underground parking, non-residential premises for public services, Zheltoksan Street, 202a, 204a, 206, 206a in the Bostandyk district of Almaty city. First stage of construction. Estimated documentation (without external engineering networks)"

The site is located in Almaty city, Zheltoksan street, 202a, 204a, 206, 206a in the Bostandyk district.

06.02.2020 year.

(until 5 p.m.) 11.02.2020 year.

Download

31

"Multifunctional residential complex" Araily "on Abylkhair Khan Ave. in Aktobe (block A / 1)."

The construction site is located on Abylkhair Khan Avenue in Aktobe.

10.03.2020 year.

(until 5 p.m.) 13.03.2020 year.

Download

32

"An apartment building complex on a fixed plot of land south of Zhumabaev St., west of Palladin St. in the Zhetysu district of Almaty" (without external utility networks). "

The construction site of the residential complex is located in Almaty, in the Zhetysu district, south of the street. Zhumabaev, west of the street Palladium.

02.04.2020 year.

(until 5 p.m.) 07.04.2020 year.

Download

33

"Construction of a multifunctional residential complex" TEREMKI "with built-in infrastructure, located at the address: Turksib district, 51 Seyfullina ave. And 99 Budennogo street, in Almaty. The first phase of construction. The first launch complex 2-15; The second launch complex 16- 27 "(without external engineering networks and estimate documentation).

The construction site of the residential complex is located in Almaty, Turksib district, 51 Seyfullina ave. And ul. Budyonny 99.

04.06.2020year.

(until 5 p.m.) 09.06.2020year.

Download

34

"Construction of a multi-storey residential complex at the address: Atyrau region, Atyrau city, Nursay microdistrict, street No. 11, building No. 6"

The construction site is located in the city of Atyrau, Nursay microdistrict, street No. 11 building No. 6.

25.06.2020 year.

Until 5:00 p.m. 06/30/2020.

Download

35

"Construction of a residential complex with underground parking, located at 16 Abay Avenue, plot No. 164 in the Bostandyk district. The first launch complex is blocks 2-12."

Construction of a residential complex with underground parking, located at 16 Abay Avenue, plot No. 164 in the Bostandyk distri

25.06.2020 year

Until 5:00 p.m. 06/30/2020

Download

36

"Multi-apartment residential complexes with built-in, built-in attached premises and parking lots, business centers, shopping and entertainment facilities, kindergartens, secondary schools and park zones in Nur-Sultan

Nur-Sultan, Esil district, No. 38 street, plot No. 11.

06.08.2020

until 17:00 hours 11.08.2020

Download

37

"Construction of a multi-apartment residential complex with underground parking, non-residential premises for servicing the population, Zheltoksan Street, 202a, 204a, 206, 206a in Bostandyk district, Almaty city. First stage of construction. Estimated documentation (without external engineering networks)"

Алматы қ., Желтоксан көщесі, 202а, 204а, 206, 206а.

25.08.2020

until 17:00 hours 28.08.2020

Download

38

«Construction of a multi-storey residential complex» STANDARD CITY» in the land plot №4558 of the residential area Nursat, Karatau district of Shymkent city (house №1,2,3,4,5,6,7)»

Shymkent city, Karatau district, residential area Nursat the land plot №4558

28.08.2020

until 17:00 hours 03.09.2020

Download

39

"Construction of a multi-apartment residential complex with built-in premises and parking. "Kalkaman-2" microdistrict, Abisheva street, house number 36, Nauryzbay district in Almaty. III stage of construction, 2 start-up complex (spots 17, 18, 19) (with external engineering networks) "

The site is located in the city of Almaty, Nauryzbay district, md. "Kalkaman-2", Abishev street, house number 36.

September 28, 2020

Until 17:00 hours 01.10.2020

Download